Portland Milwaukie Light Rail Bus Planning

In the coming months Trimet is going to be putting together a bus plan for the redundant service along the new corridor. The simple reasoning is that buses cost more to operate over time than light rail, a lot more, and the ideal situation is to get as many people to take the light rail and operate feeder service to get people to the light rail. This is a tricky process, here’s a few of the reasons why:

  • Some bus lines would be more logical, like the #33, the stop in Milwaukie or the last stop of the PMLR line and transfer all passengers to a waiting MAX train. The MAX won’t have traffic to battle, will have an easier and faster ingress trip and egress trip out of the city. Timing the connection with the #33 will be really easy, as the service can now operate as an extension of the light rail service instead of fighting with traffic on McLoughlin (the bulk of its trip between Portland and Milwaukie). So a large part of the #33 route could be canceled, saving millions per decade and putting that money into other bus operations and capital such as the #33 between Oregon City and Milwaukie.
  • Other bus lines get tricky, the #19 for instance will cross over (with its current route) the new MAX at one of the stations. But the route on either side of that serves people that may or may not be going downtown. Beyond that, making connections with the MAX is more difficult because of its less than frequent service and which direction would connect with which MAX? The #19 wouldn’t just be merely an extension, but instead would act largely like a feeder. An example would be, if someone got on in the suburbs, instead of riding the whole route it would be faster to deboard and alight the coming MAX train, that would arrive in town faster and more reliably than the #19 bus would. This route then becomes a question of, “what to do?” Increase service? Leave it untouched? Decrease service between X & Y points, increase service immediately between MAX connection points to enable better connector service?
  • #31 and #32 both come from various parts of the metro area and converge on McLoughlin, again making for a perfect direct connection with the MAX. However both buses are arguably faster during low traffic times and slower during higher traffic times. Both bus routes are generally low ridership, so connecting the transfers to the MAX might behoove costs, but maybe not ridership. It however could have the opposite affect on ridership and increase. Would having the end points connected between Clackamas Town Center (where one of the buses goes) vs. where the other goes be improved if we bumped up service levels and connected it reliably to the MAX line going in? What would be the loss vs. the gain of doing so? Whatever the case, it isn’t smart continuing to run these two routes as is when the MAX line offers a lower cost option than running the bus just for the few riders that do take it along the McLoughlin Corridor – in this case, one would logically try the increased connector service but eliminate the service along McLoughlin into downtown. This would create a two-seat (ie. a transfer is required) ride to downtown but it would make for a dramatically more cost efficient ride if the ridership stays relatively the same on these routes or slightly increases. If it increases dramatically it would still be best to transfer riders to the MAX instead, as more service could be provided overall.

Have you thought much about how the service will change, what might change, or thought about getting involved? If any of these buses are ones you ride you should check out the upcoming bus service planning around the opening of the PMLR line. You can’t wait and expect to make a difference, you have to get involved now! Here’s a list of the lines that will be affected with the opening of the PMLR in 2015 (and possibly sooner even).

  • 9-Powell Blvd
  • 17-Holgate/Broadway
  • 19-Woodstock/Glisan
  • 28-Linwood
  • 29-Lake/Webster Rd
  • 30-Estacada
  • 31-King Rd
  • 32-Oatfield
  • 33-McLoughlin
  • 34-River Rd
  • 35-Macadam/Greeley
  • 36-South Shore
  • 43-Taylors Ferry Rd
  • 66-Marquam Hill/Hollywood
  • 70-12th/NE 33rd Ave
  • 75-Cesar Chavez/Lombard
  • 99-McLoughlin Express
  • 152-Milwaukie

Division Street is Looking Great! Let’s Destroy Division Street!

There’s new construction on Division & 32nd that has the road torn up and down to one lane. The construction gaurd is polite, offers me immediate passage across the street to the bus stop. I’m one of the many lucky souls in Portland that lives within a hundred feet of a bus, light rail, passenger rail or streetcar stop. Today I’m boarding the trusty #4 Route Bus into downtown Portland.

As the construction gaurd flips his sign from stop to slow, the traffic from the western direction, which is where my bus is arriving, starts to trickle through. I stand at the bus stop prepared to board. I check my smart phone to insure that I’ve purchased a day pass. I verify that I have and count the seconds. One car, two car, three car and four. The bus then pulls through and stops gingerly in front of me.

I step aboard to prevent any lingering wait that the cagers surely draw frustration from. The driver is already smiling and greets me with a “it’s really running the gauntlet today”. He refers to Division Street as a whole. From 39th to 10th or so it has been under construction from many months, if not more than a year now.

Division Street Grows Into Something Worthwhile

Four years ago Division Street was nothing but a small two lane arterial that switched into 4 lanes at random places. It is a residential street with front yards and children playing nearby. Now it is under immense pressure to become consistent, to grow in a smarter way than just acting as a naive arterial only for cars.

Division has grown sidewalks for the length of the street from 8th all the way to 82nd. Before there were gaps, dangerous gaps. Division has gone from inconsistency of two or four lanes to a solid two lanes from 82nd to 8th. At 8th is where something new is sprouting in the Portland & Milwaukee Light Rail Line. Between 12th and 30th there are fixes to and dramatic additinos of bioswales and other road amenities. These amenities are known to increase pedestrian and motorist safety. Between 60th and 82nd the lanes have gone from an unwieldy and dangerous four lanes to two, consistent with the rest of the street. Along the sides now are buffered bike lanes and other amenities for bus pull outs, timed traffic lights and other small items that help the flow of all traffic, not just cars.

Slowly Division itself becomes something, with bioswales and a consistent two lanes for its length. Service on the road is getting an increase in just a few more weeks. The #4 Trimet Bus is increasing back to what is referred to as frequent service. This means 15 minute frequency or better throughout the day. Beyond frequent service there is also going to be an increase for rush hour.

Slowly the auto dependency of Division is becoming less violent and fading into a small nuissence that provides a meager enabler for the street. Already today, actively there are three transportation means that already rule over the automobile when looked at as a whole; public transit, biking and walking. Not only have these modes become the dominent form of transport for customers to the growing businesses along Division. These modes, now dramatically safer with the taming of traffic violence, are once again becoming of dominant use to those teaching, attending and maintaing the schools in the area. That’s thousands and thousands of trips that no longer rely on the automobile, decreasing the auto-dependency of those that now have this new freedom.

A True Place

Some screamed when all of this started. Capitalism was at play in a huge way taming the automobile here. Some hate that, some love it. The city gave liberty to developers and stopped forcing them by regulation and law to build parking. If they saw a reason not to or demand didn’t dictate they simply didn’t have to build apartments with parking. Some of the residents saw this as a massive problem. With multiple apartments open that are without parking, there is still no shortage of parking. With the largest of the apartments without parking ready to open in the coming month or two, there still is a growing sense that this will become an enabler to the area versus a detractor.

Along this corridor the city has seen a dramatic increase in businesses opening up. This is in addition to new homes, apartments and other domiciles for people to live in the city. Almost 5x as many businesses, many local, now exist compared to just two years ago. Most of these businesses are now doing a brisk trade too. When auto-dependency ruled the street the businesses popped up but then immediately suffered. These businesses, many catering to the automobile, had not only been hurt by the auto-dependency but also hurt the existing businesses that were there before. The street was a ghost town as the 60s and 70s rolled in.

Let’s Destroy It All

Years ago the shortsighted advocates of auto-dependency wanted to pave all of Division, forcefully relocate the residents, destroy the homes all the way out to Clinton Street and possibly as far as Lincoln street in some cases on the other side. What they wanted to do, to be sure anybody could drive as fast as possible from downtown Portland to I-205 and the suburbs was build a new Interstate. They wanted to destroy all of this under the false guise that it would somehow make the neighborhoods better if they have more auto-dependent access. We know now, and thankfully didn’t make this mistake, that Interstates and increased auto-dependency do not increase livability or the quality or value of one’s neighborhood. If anything it pushes people further away and creates a massive thing that most people don’t actually want to live anywhere near.

As I ride through and down Division today to run my errands, enjoy an espresso and head into downtown for a few meetings I’m extremely happy that Division and most of the respective southeast neighborhood wasn’t destroyed to make way for an Interstate. The thousands of people that live here and enjoy an extremely high standard of living would have been left with a dwindling and disused neighborhood. A neighborhood that would have had little hope for repair. Now the neighborhood is anything but that. The number one reason why is because the city and the people of the city didn’t allow an Interstate to be cut through the area!

Until later, happy riding.

So What’s Your Take on Graffiti? Is it Art? What About Mold?

There’s a very interesting point to be made in this Instagram photo and the comment that goes along with it.

Get That Graffiti! (Click to navigate to the original Instragram Post)

Get That Graffiti! (Click to navigate to the original Instragram Post)

There always seems to be a thin line between graffiti, tagging, art, mural and related things in public. One person’s art is another person’s disgust it always seems. So where does one draw the dividing line between a crap building and a good building, one that is blight and one that is not? In the picture, it’s obvious that the real problem is just as much the mold as the tags that were on the wall. It just makes one think, “what’s ok and what isn’t?” I’m always pondering how we could improve things in Portland.

I’ve always drawn differentiations between graffiti as something that is masterful, tagging as something done in disrespect and is trashy, murals as something the community has done and is similar in many ways to graffiti and art can be almost anything. Albeit there is one place where any types of markings are dangerous and uncalled for. Don’t tag the freight cars, there’s important information there. There’s also murals and other montages that have been put on the sides of trains before. Then there is the dreaded advertisement that ends up on the side of trains and such.

So what are the divides? How would you identify each of these divides? What offends you, bothers you or gives you a smile to wear on your face?